Roof-level parapet repair works at Kingsdown School, Swindon, by MPS Concrete Solutions

Case Study — Structural Concrete Repair

KINGSDOWN SCHOOL

Structural Concrete Repair & Render Reinstatement

7
Site Visits
350+
Repair Locations
200kg+
Mortar Used
0
Access Disruptions

Project Overview

MPS Concrete Solutions were engaged to carry out structural concrete repair and render reinstatement across the exterior envelope of a secondary school in Swindon.

The building presented widespread spalling and cracking across rendered columns, window cills, parapets and external wall panels spanning multiple elevations. Corrosion of embedded reinforcement was confirmed at numerous locations, with carbonation visible where render cover had been lost. The programme ran across seven working days between 28 July and 19 August 2025, with works carried out using scissor lifts and cherry pickers to access upper elevations. All works were completed whilst the building remained occupied and operational.

The Challenge

The building presented deterioration across a significant number of discrete locations, many of which required access at height. Spalling had progressed to expose reinforcement in several columns, with corrosion staining evident. Cracked render and delaminating sections posed a risk of falling material. Works were phased to maintain safe pedestrian access across the site throughout.

The MPS Solution

MPS operatives followed a consistent repair sequence across all locations: breakout of damaged render and concrete, cleaning of any exposed steelwork, application of corrosion-inhibiting treatment, and reinstatement using structural repair mortar to achieve a smooth, level finish. Works were completed in a logical sequence across elevations, with each visit targeting a defined set of reference numbers.

28–31 July 2025

Breakout of damaged render across initial elevation. Exposed steels cleaned. Sika corrosion primer applied. Repair mortar installed at surveyed locations.

4–7 August 2025

Continued breakout and reinstatement programme. Scissor lifts deployed to upper-level column and parapet locations. Over 140 zones treated.

19 August 2025

Final visit. Roof-level slab crack filling and parapet cap reinstatement completed. Inspection post-repair carried out.

Materials & Method

Primary repair mortar: structural repair mortar (cementitious, polymer-modified), applied by hand to produce a smooth, level finish flush with adjacent surfaces. Bonding agent applied at all interfaces. Total material usage in excess of 200 kg across the programme. All materials specified and applied in accordance with manufacturer guidance.

Outcomes

All identified repair zones were addressed within the planned programme. Exposed reinforcement was cleaned and treated prior to reinstatement, arresting the active corrosion mechanism and preventing further deterioration of the concrete cover. The finished repairs were inspected on completion of each visit, with post-repair condition recorded as satisfactory. The completed works restore the structural and weathertight integrity of the external envelope across the affected elevations.

  • Reinforcement protected — corroding steels cleaned and treated at all exposed locations prior to mortar reinstatement.
  • Structural render reinstated — polymer-modified structural mortar applied to restore cover depth and surface integrity.
  • Over 350 locations repaired — discrete repair zones across columns, cills, parapets and wall panels, all recorded on site sheets.
  • Zero access disruption — full programme delivered without loss of pedestrian access or interruption to building operations.

Project Details

Project

Kingsdown School

Client Type

Educational Estate

Focus

Structural Concrete Repair & Render Reinstatement

Location

Swindon, Wiltshire

Programme

July – August 2025

Accreditations

  • Constructionline Gold
  • SSIP Accredited
  • ISO 9001 / 14001 / 45001
  • CRA Member
  • Sika-Specified Applicator
  • Veteran-Led Business

Project Gallery

Condition survey, progressive repairs and post-repair finish across the building envelope

Spalled render and exposed reinforcement at a rendered column at Kingsdown School
Condition survey — spalling render and exposed reinforcement at a column
Spalled parapet cap exposing aggregate at roof level at Kingsdown School
Spalled parapet cap at roof level prior to reinstatement
Window head repair patch above glazing at Kingsdown School
Repair patch to window head above glazing
Structural repair mortar applied to a rendered column between windows at Kingsdown School
Structural repair mortar reinstated to a rendered column
Cracked parapet cap at roof level prior to crack filling at Kingsdown School
Cracked parapet cap identified during the survey
Roof-level slab crack filled with repair mortar at Kingsdown School
Roof-level slab crack filled on the final visit